Thursday, January 10, 2019
An Speir - Mid-Summer and Mid-Winter - West Elevation 2018
Saturday, April 18, 2015
Monday, October 20, 2014
Details : Windows and Window Openings
First Mock up for the windows
Setting up for the Slate reveals - Sills
Setting up for Slate reveals - head
Tuesday, August 5, 2014
First Floor Posi-Joists
Posi Joist Hanger fixed to timber packer in steel I-beam for stair void
Air tightness membrane placed behind the hanger and wrapped around the hanger where it sits on the inner wall
View from the Kitchen back to the Glazed Link
View from the Utility Room back to the Old Farmstead
Thursday, July 31, 2014
Update of the Project
Original Planning Sketch
Jennie Castle
Passive House
Building Energy Rating 'A'
Water borehole installed
150m Geo-thermal borehole installed as heating source for the underfloor heating
Sub-structure services installed- electrical conduits, sewerage
Structure : foundations, rising walls, sub-floor, external and internal walls, structural steel beams
and Posi-floor joists to main house installed.
Main house ready for the next level up!
Precast slabs for the garage scheduled for 10days time together with
external precast stairs for the pedestrian entrance and the walled garden
Thursday, July 3, 2014
The Great Wall
The Great Wall
Profile of 'The Great Wall' - the retaining wall which forms the Walled Garden -
before back-filling
Foundations for the stair, which will link the Old Farmstead to
the new Walled Garden, and for the pond
Plan of Walled Garden and Link Stair
Wednesday, June 18, 2014
Internal walls laid out and sub-slab reinforcement ready for the great pour...
Slab will be stopped at either side of the main service channel through the garage
Concrete pad for the steel base plate for the staircase
Monday, June 16, 2014
Radon installed
Radon installed by specialists
D & D Radon Services, Mullinavat, Co Kilkenny
Radon laid on 50mm sand blinding
One radon sump installed for house area
Tuesday, May 27, 2014
Rising Blockwork Started
The rising blockwork from the foundation to the top of screed level started
365mm insulated block wall construction
200mm of compacted hardcore
Ground Floor Plan
Friday, May 9, 2014
Geo Thermal Borehole
The site has been sculpt to create the base platform for the house and to create access for the Geo-thermal borehole drilling.
The drilling of the Geo-thermal borehole happened today
by Tom Fogarty Drilling
Saturday, September 28, 2013
Sunday, August 4, 2013
The Stone Outbuildings - Building C - Proposed Garden Shed and Storage
While the old farmstead has been patiently waiting for its stone outfit, the solid stone outbuildings are reappearing, course by course in beautiful Irish sandstone and granite....
Up to flagstone level
View from inside the courtyard
View from the neighbour's property
Up to the flagstone level
Work started from the outside boundary wall
Preparation for the foundations
Hidden in the vegetation - Building C - Proposed Garden Shed
Site Plan
A - Old Farmstead
B - Proposed Pump House and Storage
C - Proposed Garden Shed
Sunday, April 14, 2013
LANDSCAPE : First trees planted - White Stemmed Birch Trees
Thanks to Elmer Dool of Sunhill Nurseries for planting and staking the 5 trees
Landscape Plan for submission to Kilkenny Council