Showing posts with label eco house Ireland. Show all posts
Showing posts with label eco house Ireland. Show all posts

Tuesday, August 5, 2014

First Floor Posi-Joists

Posi-joists combine the lightness of timber with the strength of web steel. Services can be run through the web zone.





Posi Joist Hanger fixed to timber packer in steel  I-beam for stair void


Air tightness membrane placed behind the hanger and wrapped around the hanger where it sits on the inner wall


View from the Kitchen back to the Glazed Link


View from the Utility Room back to the Old Farmstead

Thursday, July 31, 2014

Update of the Project



Original Planning Sketch
Jennie Castle


Passive House 
Building Energy Rating 'A'

Water borehole installed
150m Geo-thermal borehole installed as heating source for the underfloor heating
Sub-structure services installed- electrical conduits, sewerage
Structure : foundations, rising walls, sub-floor, external and internal walls, structural steel beams
and Posi-floor joists to main house installed.

Main house ready for the next level up!

Precast slabs for the garage scheduled for 10days time together with 
external precast stairs for the pedestrian entrance and the walled garden




Thursday, July 3, 2014

The Great Wall

The Great Wall

Profile of 'The Great Wall' - the retaining wall which forms the Walled Garden - 
before back-filling


Foundations for the stair, which will link the Old Farmstead to
 the new Walled Garden, and for the pond





Plan of Walled Garden and Link Stair


Monday, June 16, 2014

Radon installed



Radon installed by specialists
D & D Radon Services, Mullinavat, Co Kilkenny



Radon laid on 50mm sand blinding
One radon sump installed for house area

Tuesday, May 27, 2014

Rising Blockwork Started

The rising blockwork from the foundation to the top of screed level started


365mm insulated block wall construction


200mm of compacted hardcore


Ground Floor Plan


Friday, May 9, 2014

Geo Thermal Borehole

The site has been sculpt to create the base platform for the house and to create access for the Geo-thermal borehole drilling. 

The drilling of the Geo-thermal borehole happened today 
by Tom Fogarty Drilling




Saturday, September 28, 2013

Breaking new ground!


Platform has been defined and the top soil removed in preparation for the
 ground works of the new passive house!


Original axonometric sketch
Jennie Castle

Sunday, August 4, 2013

The Stone Outbuildings - Building C - Proposed Garden Shed and Storage

While the old farmstead has been patiently waiting for its stone outfit, the solid stone outbuildings are reappearing, course by course in beautiful Irish sandstone and granite....


Up to flagstone level






View from inside the courtyard


View from the neighbour's property


Up to the flagstone level


Work started from the outside boundary wall


Preparation for the foundations


Hidden in the vegetation - Building C - Proposed Garden Shed



Site Plan
A  - Old Farmstead
B - Proposed Pump House and Storage
C - Proposed Garden Shed

Sunday, April 14, 2013